TUCSON ELECTRIC POWER CO: other noncurrent liabilities
Other noncurrent liabilities for TUCSON ELECTRIC POWER CO. Inspect selected reporting periods, original units and SEC filing links; download the financial history.
All TUCSON ELECTRIC POWER CO financial histories
What this measure means
Noncurrent liabilities the filer does not present separately. The composition differs by filer and is described only in the filing.
Exact concept: us-gaap:OtherLiabilitiesNoncurrent. Each value is a balance at the reporting date, not a flow earned over a year. Different units remain separate; no currency conversion or interpolation is applied.
Coverage of this history
Selected reporting periods run from 2013-12-31 to 2025-12-31. The SEC response was captured on 2026-09-21.
Selected filing history
| Period start | Period end | Value | Unit | Filed | Source filing |
|---|---|---|---|---|---|
| At date | 2025-12-31 | 68,509,000 | USD | 2026-02-12 | 10-K · 0000100122-26-000006 |
| At date | 2024-12-31 | 71,044,000 | USD | 2026-02-12 | 10-K · 0000100122-26-000006 |
| At date | 2023-12-31 | 177,435,000 | USD | 2025-02-14 | 10-K · 0000100122-25-000004 |
| At date | 2022-12-31 | 193,941,000 | USD | 2024-02-09 | 10-K · 0000100122-24-000002 |
| At date | 2021-12-31 | 205,449,000 | USD | 2023-02-10 | 10-K · 0000100122-23-000004 |
| At date | 2020-12-31 | 171,522,000 | USD | 2022-05-20 | 10-K/A · 0000100122-22-000020 |
| At date | 2019-12-31 | 166,656,000 | USD | 2021-02-12 | 10-K · 0000100122-21-000005 |
| At date | 2018-12-31 | 123,564,000 | USD | 2020-02-13 | 10-K · 0000100122-20-000006 |
| At date | 2017-12-31 | 102,697,000 | USD | 2019-02-15 | 10-K · 0000100122-19-000004 |
| At date | 2016-12-31 | 89,009,000 | USD | 2018-02-27 | 10-K/A · 0000100122-18-000008 |
| At date | 2015-12-31 | 94,724,000 | USD | 2017-02-16 | 10-K · 0000100122-17-000003 |
| At date | 2014-12-31 | 84,674,000 | USD | 2016-02-18 | 10-K · 0000100122-16-000034 |
| At date | 2013-12-31 | 76,133,000 | USD | 2015-02-19 | 10-K · 0000100122-15-000003 |
Related financial histories
- TUCSON ELECTRIC POWER CO: total assets
- TUCSON ELECTRIC POWER CO: total liabilities
- TUCSON ELECTRIC POWER CO: stockholders equity
- TUCSON ELECTRIC POWER CO: cash and cash equivalents
- TUCSON ELECTRIC POWER CO: net income or loss
- TUCSON ELECTRIC POWER CO: operating cash flow
- TUCSON ELECTRIC POWER CO: capital expenditure payments
- TUCSON ELECTRIC POWER CO: revenue
- TUCSON ELECTRIC POWER CO: contract revenue excluding tax
- TUCSON ELECTRIC POWER CO: financing cash flow
- TUCSON ELECTRIC POWER CO: investing cash flow
- TUCSON ELECTRIC POWER CO: retained earnings or deficit
- TUCSON ELECTRIC POWER CO: income tax expense or benefit
- TUCSON ELECTRIC POWER CO: share-based compensation expense
- TUCSON ELECTRIC POWER CO: operating income or loss
- TUCSON ELECTRIC POWER CO: current assets
- TUCSON ELECTRIC POWER CO: interest expense
- TUCSON ELECTRIC POWER CO: current liabilities
- TUCSON ELECTRIC POWER CO: current accounts payable
- TUCSON ELECTRIC POWER CO: net current accounts receivable
- TUCSON ELECTRIC POWER CO: operating expenses
- TUCSON ELECTRIC POWER CO: cash including restricted cash
- TUCSON ELECTRIC POWER CO: accumulated other comprehensive income or loss
- TUCSON ELECTRIC POWER CO: operating lease right-of-use asset
- TUCSON ELECTRIC POWER CO: operating lease liability
- TUCSON ELECTRIC POWER CO: long-term debt
- TUCSON ELECTRIC POWER CO: gross property, plant and equipment
- TUCSON ELECTRIC POWER CO: accumulated depreciation on property, plant and equipment
- TUCSON ELECTRIC POWER CO: other noncurrent assets
- TUCSON ELECTRIC POWER CO: current contract liabilities
- TUCSON ELECTRIC POWER CO: net deferred tax liabilities
- TUCSON ELECTRIC POWER CO: pre-tax income or loss from continuing operations
- TUCSON ELECTRIC POWER CO: comprehensive income or loss
- TUCSON ELECTRIC POWER CO: net income available to common stockholders
- TUCSON ELECTRIC POWER CO: depreciation expense
- TUCSON ELECTRIC POWER CO: nonoperating interest expense
- TUCSON ELECTRIC POWER CO: other nonoperating income or expense
- TUCSON ELECTRIC POWER CO: nonoperating income or expense
- TUCSON ELECTRIC POWER CO: current income tax expense or benefit
- TUCSON ELECTRIC POWER CO: deferred income tax expense or benefit
- TUCSON ELECTRIC POWER CO: interest paid, net
- TUCSON ELECTRIC POWER CO: income taxes paid, net
- TUCSON ELECTRIC POWER CO: change in accounts receivable
- TUCSON ELECTRIC POWER CO: change in inventories
Inspect the source
- Entity
- TUCSON ELECTRIC POWER CO / CIK 0000100122
- Captured
- 2026-09-21T17:16:56.128Z
- SEC response SHA-256
8831a8a6ea864f25b64639a2a92f629ba1afceca790b7f945b895a7c5020d2f4
Current SEC company facts · Download the original response snapshot (gzip) · Download the selected JSON
Latest-filed annual-report facts per unit and reporting period at capture time. Duration facts cover 300 to 400 days. This selection can include restatements and is not a point-in-time backtest dataset. Missing concepts are omitted, never zero-filled. Values retain original units and are not currency converted. Extended concepts require compatible unit shapes and at least three reporting ends with changing values within one unit. Constant or incompatible added histories are omitted.
Public company accounting reference, not market prices, returns, an investment recommendation, or ALPHAC performance. Validate a separately constructed return series with the validation API; accounting values are not returns.
Use this in research
A financial period ends before its results become public. Use the filing date as a minimum availability boundary, inspect amendments, and retain the original filing vintage when testing historical signals. This latest-filed selection can contain information unavailable at the time.
These pages do not supply prices, total-return histories, corporate-action adjustments or a tradable universe. Build those inputs separately before evaluating a strategy. A profitable backtest can still reflect selection bias or costs that were left out.
Research methodology · Execution and cost assumptions · Check backtest overfitting
Build with the open-source tools
Use these accounting records as inspectable inputs. When you have constructed a return series, the validation tools can help test its statistical evidence and preserve the result with its limitations.
- Get an API key and run your first validation
- Connect the MCP server to your coding assistant
- Inspect the ALPHAC engine on GitHub
- Read the MCP server source and integration examples
Read the published dataset with Python
import json
from urllib.request import urlopen
with urlopen("https://canlicapital.com/company-data/0000100122.json") as response:
record = json.load(response)
print(record["fetched_at"])
print(record["policy"])
for concept in record["concepts"]:
print(concept["tag"], next(iter(concept["observations"])))